Site: Haugaland

55 Ha of land, 15 km to Haugesund International airport. The site is close to a substation with 32 MW capacity in 2022, which can be expanded to 200 MW in 2026.
Site: Haugaland is part of a 500 ha industrial park with significant growth opportunities. The city centre of Haugesund is about 30 minutes away by car. Other infrastructure include dark fibre access, and an ISPS certified port next to the site.
Owner
Location |
Haugaland Næringspark AS Facilitated by Statkraft Tysvær, Rogaland |
Site accessibility & infrastructure |
Haugesund Airport: 15 km Haugesund city: 20 km Stavanger city: 65 km Stavanger Airport: 72 km |
Site area |
55 Ha |
Available power |
2019: 5 MW 2022: 32 MW 2026: 500 MW Hot-Tap for natural gas supply on site |
Connectivity |
Fiber is available on site |
Zoning |
Industrial Zoning Regulations and |