Site: Haugaland

55 Ha of land, 15 km to Haugesund International airport. The site is close to a substation with 32 MW capacity in 2022, which can be expanded to 200 MW in 2026.

Site: Haugaland is part of a 500 ha industrial park with significant growth opportunities. The city centre of Haugesund is about 30 minutes away by car. Other infrastructure include dark fibre access, and an ISPS certified port next to the site.

 

Owner

 

Location

Haugaland Næringspark AS

Facilitated by Statkraft

Tysvær, Rogaland

Site accessibility  &   infrastructure

Haugesund Airport:        15 km

Haugesund city:    20 km

Stavanger city:       65 km

Stavanger Airport:      72 km

Site area

55 Ha

Available power

2019: 5 MW

2022: 32 MW

2026: 500 MW

Hot-Tap for natural gas supply on site

Connectivity

Fiber is available on site

Zoning

Industrial Zoning Regulations and
Plan Completed